Base plant laid in 2011, by SOCAR Turkey Enerji A.Ş., the Turkish subsidiary of Azerbaijan-based SOCAR, made with an investment of $6.3 billion.
With this feature, by the private sector at once is the biggest investment.
Construct the facility undertaken by a consortium of Técnicas Reunidas (Spain), Saipem (Italy), GS Engineering (South Korea) and ITOCHU (Japan). style="-webkit-font-smoothing: subpixel-antialiased; -webkit-text-stroke-color: transparent; text-align: left;">All on campus The watchtowers are bullet and bomb resistant as a high security building.